Master Plan
The Master Plan was prepared on the basis of a Grant Agreement between the SE “Chisinau International Airport” and the European Bank for Reconstruction and Development as Administrator of Grant Funds provided by the European Union under the Neighbourhood Investment Facility..
- Chisinau Airport Master Plan, may 2010 (English version / Russian version)
- Ownership Airport Land
- Obstacle Limitation Surfaces, Take off Surfaces
- Obstacle Limitation Surfaces, Approach Surfaces
- Obstacle Limitation Surfaces, Approach Surfaces
- Water Dralnage System Phase 1 (2015/16)
- Water Dralnage System Phase 2 (2025)
- Water Dralnage System Phase 3 (2030)
- Utilities System Phase 1 (2015/16)
- Utilities System Phase 2 (2025)
- Utilities System Phase 3 (2030)
- Airport Development Concept Phase 1 (2015/16)
- Airport Development Concept Phase 2 (2025)
- Airport Development Concept Phase 3 (2030)
- Air Pollutants Dispersion Chisinau Airport, Operational Phase - 2015
- Air Pollutants Dispersion Chisinau Airport,Operational Phase – 2030
- Noise Map (day - evening - night), Chisinau Airport, Operational Phase 2010, 2015, 2030
- Noise Map (night), Chisinau Airport, Operational Phase 2010, 2015, 2030
- Airport Development Concept Phase 3 (2030)